What Should Be in a Structural Steel BOQ Template? (Complete Checklist)
Most free BOQ templates you'll find online are a single flat list of items. A professional, tender-ready structural steel BOQ needs a lot more structure than that — here's the full checklist.
Why Most Free BOQ Templates Fall Short
Search for a "structural steel BOQ template" and you'll find plenty of free spreadsheets — usually a single sheet with Description, Unit, Quantity, Rate and Amount columns. That's a start, but it's not what a general contractor, steel fabricator or PMC actually needs to issue a tender or track a bid.
A structural steel scope touches supply, fabrication, erection, bolting, welding, painting, fireproofing, decking, cladding, testing and mobilization — each with different units of measure, different codes, and different rate logic. A flat, single-sheet template collapses all of that into one undifferentiated list, which is exactly how scope gets missed and bids become impossible to compare apples-to-apples.
The 8 Sections Every Steel BOQ Needs
Whatever software you use, a complete structural steel BOQ should break the work into these eight sections, priced separately:
A. Supply of Structural Steel
Fabricated columns, beams, transfer girders, bracing, trusses, purlins, girts and connection plates — priced per ton, broken out by structural role, not blended into one rate.
B. Erection at Site
Hoisting, aligning, plumbing and temporary bracing for each member group, co-terminous with the supply tonnage above.
C. Connections, Fasteners & Welding
A325/A490 bolts, anchor rods, site fillet and CJP welds, priced per EA or per Lb, referencing AWS D1.1 and the RCSC Specification.
D. Surface Protection
Shop priming, finish painting, intumescent fireproofing and galvanizing — priced per SF or per ton dipped.
E. Metal Decking & Cladding
Composite floor deck, roof deck, insulated wall panels and flashing/trim, priced per SF or LF.
F. Miscellaneous Steel
Stairs, handrails, ladders, gratings and equipment platforms — easy to forget, expensive to add later.
G. Testing, Inspection & QC
UT/PT/RT weld testing, bolt verification, DFT surveys and (in Florida) threshold building special inspection.
H. Mobilization & Temporary Works
Crane mobilization, temporary works, as-built documentation and permit/inspection coordination.
Supporting Tabs a Professional Template Also Needs
The priced BOQ is only one tab. A tender-ready workbook should also include:
Cover Sheet
Project info, governing codes, wind design basis and steel grade summary in one place.
General Notes & Preambles
Scope, method of measurement, inclusions/exclusions and payment terms — the fine print that prevents disputes later.
Rate Analysis
A visible cost build-up (material + labor + consumables + overhead + profit) for at least a few key items, so reviewers can sanity-check your rates.
Material Take-off
An independent tonnage cross-check against a benchmark lb/SF steel-intensity ratio, before you issue the tender.
Bid Form
A signed declaration with the grand total pulled automatically from the summary — not retyped.
We Already Built This Template
All 8 BOQ sections plus Cover Sheet, General Notes, Rate Analysis, Material Take-off and Bid Form — live formulas throughout, built for the Florida market.
Get the BOQ Template – $49 →Codes & Standards a Real BOQ Should Reference
Every line item should cite the standard governing it, not just a generic description. For Florida structural steel work that typically means AISC 360 (Specification for Structural Steel Buildings), Florida Building Code wind provisions from ASCE 7, the AWS D1.1 welding code, the RCSC Specification for high-strength bolting, and OSHA 29 CFR 1926 Subpart R for erection safety.
If the project meets Florida's statutory definition of a threshold building, add a line item for the required Special Inspector and Structural Inspection Plan under Florida Statute §553.79.
Mistakes That Show Up in Homemade BOQs
Blending erection into the supply rate
Supply and erection have completely different cost drivers (material vs. labor/crane time) and should never share one $/ton number.
No rate back-up
A rate with no visible build-up invites reviewers to challenge it — or worse, to quietly discount it.
Missing the miscellaneous steel section
Stairs, ladders, gratings and platforms are easy to forget and expensive to add as a change order later.
No tonnage sanity check
Without a benchmark lb/SF comparison, a mis-keyed quantity can sail straight through to the grand total.
Frequently Asked Questions
Even a small steel package benefits from the Cover Sheet, the section breakdown and a basic Rate Analysis — you can simply price fewer line items within each section.
Yes, this checklist works with any spreadsheet software. If you'd rather start from a working file instead of building one from scratch, our template already has every section and tab structured with live formulas.
The section structure applies anywhere. The Florida-specific pieces are the wind design basis (ASCE 7 hurricane provisions), the Florida Building Code references and the threshold building inspection requirement under F.S. §553.79.
Skip the Blank Spreadsheet
Get our tender-ready, 60-item Structural Steel Works BOQ template — 9 tabs, live formulas, Florida codes referenced. $49, instant download.
Get the BOQ Template – $49 →