Construction BOQ Template — 90-Item, 15-Division Bill of Quantities for General Construction
A complete, 9-tab Google Sheets workbook built for the Florida market: Cover Sheet, Document Control, General Notes, Abbreviations, BOQ Summary, a 90-item Detailed BOQ across all 15 general-construction divisions, live-linked Rate Analysis, a Cost Benchmark tab and a Bid Form — all formula-driven.
A Complete, Professional 9-Tab BOQ Workbook
Built around a realistic multi-trade general-construction project, this workbook shows exactly how a professional Florida BOQ should be structured across every major division — sections, codes, rate back-up and all — so you can adapt it to your own project in minutes instead of building one from a blank sheet.

1. Cover Sheet
Branded tender cover page with project info block, BOQ reference/revision control and currency & units basis for the entire workbook.
2. Document Control
Revision history and sign-off table (Prepared / Checked / Approved) so your issued BOQ has a clean audit trail.
3. General Notes & Preambles
Scope of work, method of measurement, governing codes (ACI 318, TMS 402/602, FBC 8th Ed./IBC 2021, NEC, IMC/IPC, NFPA), QA/QC, HSE and payment-terms preambles for every division.
4. Abbreviations & Definitions
A full glossary of construction, trade and Florida-specific abbreviations used consistently across all 15 divisions.
5. BOQ Summary
One-page abstract rolling up all 15 division sub-totals plus overhead & profit (10%) and contingency (5%) into a single bid total — fully formula-linked.
6. BOQ Detail – 90 Items, 15 Divisions
Preliminaries, Site Prep & Earthworks, Concrete, Masonry, Structural Steel (condensed), Carpentry, Waterproofing/Roofing, Doors/Windows/Glazing, Finishes, Specialties, HVAC, Plumbing, Electrical, Fire Protection and External Works — every line with a Spec/Code Reference, unit, quantity, rate and amount.
7. Rate Analysis
Live, formula-linked cost build-ups (material + labor + consumables + overhead + profit) for representative items such as cast-in-place concrete and CMU block wall — edit the backup and your BOQ rate updates automatically.
8. Cost Benchmark
A reference cost-per-square-foot comparison tab so you can sanity-check your total against typical general-construction ranges before you submit.
9. Bid Form
Ready-to-sign bid declaration with grand total auto-pulled from the BOQ Summary, bid validity, bonding note and authorized-signatory block.
All 15 Divisions, In One Workbook
Every division below is a separate, sub-totaled section in the BOQ Detail tab — 90 priced line items in total, rolling up into the BOQ Summary automatically.
- Div. 1 – Preliminaries & General Requirements
- Div. 2 – Site Preparation & Earthworks
- Div. 3 – Concrete Works
- Div. 4 – Masonry
- Div. 5 – Structural Steel & Metals
- Div. 6 – Carpentry & Millwork
- Div. 7 – Waterproofing, Insulation & Roofing
- Div. 8 – Doors, Windows & Glazing
- Div. 9 – Finishes
- Div. 10 – Specialties & Equipment
- Div. 11 – Mechanical (HVAC)
- Div. 12 – Plumbing
- Div. 13 – Electrical
- Div. 14 – Fire Protection
- Div. 15 – External Works / Site Development
A Real Excerpt From the BOQ Detail Tab
Seven of the 90 line items, shown exactly as they appear in the workbook, spanning four different divisions. Every item includes a Spec/Code Reference column tying it back to the governing standard.
| Sl. | Item Code | Description | Spec/Code Reference | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|---|---|
| 6 | PRE-05 | Site safety, security and perimeter fencing for the duration of construction | OSHA 1926 / Site Safety Plan | Month | 10.00 | $4,500.00 | $45,000.00 |
| 10 | SIT-04 | Structural backfill and compaction in 8 in. lifts to 95% Standard Proctor | Geotech Report / ASTM D1557 | CY | 3,200.00 | $14.50 | $46,400.00 |
| 12 | SIT-06 | Site utility rough-in – water, sanitary sewer and storm drainage mains, excluding building connections | IPC / Local Utility Standards | LF | 2,400.00 | $62.00 | $148,800.00 |
| 55 | SPC-01 | Toilet partitions and washroom accessories | ANSI A117.1 / ADA | Lot | 1.00 | $68,000.00 | $68,000.00 |
| 58 | SPC-04 | Kitchen / break room equipment | NSF / Manufacturer's Spec. | Lot | 1.00 | $58,000.00 | $58,000.00 |
| 60 | MEC-01 | Rooftop package HVAC units, complete with curbs and controls | ASHRAE 90.1 / IMC | EA | 8.00 | $48,500.00 | $388,000.00 |
| 61 | MEC-02 | Ductwork and air distribution, galvanized sheet metal | SMACNA / IMC | Lb | 42,000.00 | $6.25 | $262,500.00 |
| Division | Description | Sub-Total |
|---|---|---|
| Division 1 | Preliminaries & General Requirements | $230,500.00 |
| Division 2 | Site Preparation & Earthworks | $305,412.50 |
| Division 3 | Concrete Works | $1,347,173.17 |
| Division 4 | Masonry | $641,186.96 |
| Division 5 | Structural Steel & Metals | $1,800,700.00 |
| Division 6 | Carpentry & Millwork | $523,035.00 |
| Division 7 | Waterproofing, Insulation & Roofing | $522,800.00 |
| Division 8 | Doors, Windows & Glazing | $821,610.00 |
| Division 9 | Finishes | $1,455,230.27 |
| Division 10 | Specialties & Equipment | $235,040.00 |
| Division 11 | Mechanical (HVAC) | $840,125.00 |
| Division 12 | Plumbing | $549,275.00 |
| Division 13 | Electrical | $1,223,350.00 |
| Division 14 | Fire Protection | $301,900.00 |
| Division 15 | External Works / Site Development | $768,250.00 |
| SUB-TOTAL – GENERAL CONSTRUCTION WORKS | $11,565,587.90 | |
| + Overhead & Profit @ 10% | $1,156,558.79 | |
| + Contingency @ 5% | $578,279.39 | |
| TOTAL BEFORE TAX | $13,300,426.08 | |

Built On Real Florida & National Standards
Florida Building Code, 8th Ed.
FBC 2023 incorporating the 2021 IBC with Florida amendments — the baseline for scope, means/methods and inspection notes across every division.
ACI 318 & ASTM Concrete Standards
Structural concrete design and material standards underlying every Division 3 cast-in-place item.
TMS 402 / 602 Masonry Code
Building Code Requirements and Specification for Masonry Structures — CMU, mortar and reinforcement items.
NEC / NFPA 70 & NFPA 13 / 10
National Electrical Code and fire-sprinkler/extinguisher standards governing Division 13 & 14 line items.
IMC / IPC & ASHRAE 90.1
International Mechanical & Plumbing Codes plus ASHRAE energy-efficiency criteria for the HVAC and plumbing divisions.
ADA / ANSI A117.1
Accessibility requirements built into specialty items such as toilet partitions, signage and wayfinding.
OSHA 29 CFR 1926
General construction safety standards referenced in Division 1 site-safety and Division 2 earthwork items.
SDI / AISC / AWS (Div. 5)
Steel Deck Institute and AISC/AWS references for the condensed structural steel scope — see our dedicated Structural Steel BOQ Template for a full 60-item steel-only breakdown.
Built for GCs, Owners, PMCs & Design-Build Teams
General Contractors & Owners
Start your next ground-up or renovation bid from a real, professionally structured 90-item, 15-division BOQ instead of a blank sheet.
Architects, PMCs & Owner's Reps
Hand every bidder a consistent, comparable BOQ format across a full multi-trade project scope.
Design-Build Teams
Use the division breakdown as a scope checklist across trades so nothing gets missed between subcontractor packages.
Estimating Students & Trainees
Study a real-world rate build-up (Rate Analysis tab) to see exactly how material, labor, overhead and profit stack into a unit rate across trades.
One Workbook. One Price. Yours to Keep.
No subscription, no recurring fees — a single 9-tab Google Sheets workbook, delivered instantly after checkout.
- Full 9-tab Google Sheets workbook
- 90-item BOQ across all 15 divisions
- BOQ Summary with O&P and contingency built in
- Live-linked Rate Analysis for key items
- Cost Benchmark comparison tab
- Ready-to-sign Bid Form
- Editable — make a copy and adapt to your own project
- Works in Google Sheets & exports to Excel
Frequently Asked Questions
It's a professionally structured template built around a realistic sample general-construction project. All quantities, rates and amounts are illustrative/sample figures for demonstration. Swap in your own measured quantities and current Florida market rates, and every division sub-total, the BOQ Summary and the grand bid amount recalculate automatically.
A Google Sheets workbook with all 9 tabs, fully formatted and formula-linked, covering 90 line items across 15 divisions. After checkout you get a link to make your own copy directly in Google Sheets — no file to download or convert, and it opens natively in Google Sheets or can be exported to Excel any time from File → Download.
Yes. Line-item amounts, all 15 division sub-totals, the BOQ Summary roll-up (with O&P and contingency), the Rate Analysis build-ups, the Cost Benchmark comparison and the Bid Form total are all live formulas — not hardcoded numbers. Change a quantity or rate and everything downstream updates.
Division 5 in this workbook is a condensed structural-steel allowance sized for a multi-trade project. If your project is steel-frame and you need a full 60-item, steel-only breakdown with its own Rate Analysis and Material Take-off, see our dedicated Structural Steel BOQ Template.
Yes — it's licensed for use on your own projects and bids (single business/company use) once you make your own copy. Redistribution or resale of the template itself, as-is or repackaged, is not permitted.
After completing checkout you'll land on a confirmation page with a button that opens Google's “Make a Copy” screen, saving the full workbook straight to your own Google Drive. If you don't see it, email us and we'll send the link directly — usually within a few hours.
Because this is an instantly delivered digital template, all sales are final. If your access link doesn't work, contact us and we'll make it right.
We also prepare custom, project-specific estimates and bills of quantities — those start at $750 depending on project size and scope. See our full estimating services for details.
Stop Building BOQs From Scratch
Get the full 9-tab, 15-division Construction BOQ template — $97, instant access.
Buy Now – $97 →