Due in the next 14 days
- Oct 21: Conner Lab Corridor Structural Improvement, FDACS
- Oct 22: Charlotte Harbor Preserve Maintenance Building Replacement, FL DEP (moved by Addendum 1)
- Oct 23: Construction Management Services RFQ, Brevard County Sheriff’s Office
- Oct 26: St. Pete Campus Fire Alarm Replacement, FL Fish and Wildlife Conservation Commission
- Oct 26: ECEP Cooling Tower Basin Improvements, Central Florida Tourism Oversight District
- Oct 27: Pinecrest Gardens Peafowl Clinic, Village of Pinecrest
- Oct 27: Howard F. Curren AWTP TECO Building Modification, City of Tampa
South Florida
| Project | Owner | Solicitation | Location | Scope | Due | |
|---|---|---|---|---|---|---|
| Pinecrest Gardens Peafowl Clinic | Village of Pinecrest | RFQu-2026-009 | Pinecrest, Miami-Dade | Construction of a small clinic building at Pinecrest Gardens | Oct 27, 10:00 AM | Official posting |
| Education Center Roof Replacement, Dr. Von D. Mizell-Eula Johnson State Park | FL Dept. of Environmental Protection | BDC10-26/27 (VBS ITB-17190) | Dania Beach, Broward | Roof replacement on the park Education Center | Oct 28, 3:30 PM | Official posting |
| General Building Repairs at Various City of Miami Parks | City of Miami | See posting | Miami, Miami-Dade | General building repairs at multiple city park facilities | Oct 29, 5:00 PM | Official posting |
| RO Plant Improvements & Membrane Replacements | Town of Jupiter | ITB W2010 | Jupiter, Palm Beach | Reverse-osmosis water plant improvements and membrane replacement. Mandatory pre-bid Oct 15, 1:00 PM. | Nov 3, 11:00 AM | Official posting |
| Long Key State Park Beach Nourishment & Campground Rebuild | FL Dept. of Environmental Protection | BDC07-26/27 (VBS ITB-17205) | Long Key, Monroe | Campground modification and rebuild, plus beach nourishment | Nov 12, 3:30 PM | Official posting |
| Awning and Sunshade Installation, Miami-Dade County Health Department | FL Dept. of Health | DOH26-002 (VBS 17125) | Multiple sites, Miami-Dade | Supply and install awnings and sunshades at several health department sites | Nov 19, 1:00 PM | Official posting |
| CM-at-risk trade bid packages: South Miami Senior High Ph II, Miami Lakes K-8, Key Biscayne K-8 (structural) | Miami-Dade County Public Schools | Projects 02580500, 02695500, 02710600 | Miami-Dade | Trade packages bid through each project’s construction manager (H.A. Contracting, Grace & Naeem Uddin, Piquer International); M-DCPS prequalification required | Rolling | Official posting |
Tampa Bay, Southwest and Central Florida
| Project | Owner | Solicitation | Location | Scope | Due | |
|---|---|---|---|---|---|---|
| Charlotte Harbor Preserve State Park Maintenance Building Replacement | FL Dept. of Environmental Protection | BDC08-26/27 (VBS ITB-16896; Addendum 1 VBS 17209) | Punta Gorda, Charlotte | Replace the park maintenance building; DEP prequalification or state license required. Due date moved from Oct 14 by Addendum 1. | Oct 22, 3:30 PM | Official posting |
| Construction Management Services RFQ | Brevard County Sheriff’s Office | RFQ-2026-01 | Cocoa, Brevard | Construction manager for a new single-story 34,587 SF masonry animal care facility | Oct 23, 4:00 PM | Official posting |
| St. Pete Campus Fire Alarm Replacement | FL Fish and Wildlife Conservation Commission | FWC 26/27-22C (VBS 16820) | St. Petersburg, Pinellas | Replace the fire alarm with a non-proprietary system across a four-building, 140,000 SF campus | Oct 26, 4:00 PM | Official posting |
| ECEP Cooling Tower Basin Improvements | Central Florida Tourism Oversight District | ITB C007159 (VBS 17067) | Central Florida Tourism Oversight District | Sluice gates, bypass piping, valves, actuators and controls at an energy plant cooling tower | Oct 26, 2:00 PM | Official posting |
| Howard F. Curren AWTP TECO Building Modification | City of Tampa | 25-C-00011 | Tampa, Hillsborough | Modification of the TECO building at the wastewater treatment plant | Oct 27, 1:30 PM | Official posting |
| CMR for Translational Research Institute | University of South Florida | 2027-118-ITN-PRO (VBS 17130) | USF | Construction manager at risk for preconstruction and construction of a new multi-story university facility | Oct 30, 3:00 PM | Official posting |
| Tampa Convention Center Switchgear Modernization | City of Tampa | 26-C-00026 | Tampa, Hillsborough | Electrical switchgear modernization | Nov 3, 1:30 PM | Official posting |
| Dade City Readiness Center REVAMP (Project 224005) | FL Dept. of Military Affairs | VBS ITB-17143 | Dade City, Pasco | Full sustainment of a 16,493 SF readiness center: roof, HVAC, electrical, plumbing, fire alarm, windows, interiors. Published estimate $1.9M. | Nov 12, 2:00 PM | Official posting |
| R3M Miscellaneous Facilities Construction Term Contract 11 | Hillsborough County BOCC | IFB-26-00401 | Hillsborough County | Term contract for miscellaneous facilities construction | Nov 17, 2:00 PM | Official posting |
| District 1 Headquarters HVAC Improvements | Florida Dept. of Transportation, District 1 | VBS ITB-17108 | Bartow, Polk | HVAC improvements at the District 1 headquarters | Nov 24, 9:00 AM | Official posting |
North Florida
| Project | Owner | Solicitation | Location | Scope | Due | |
|---|---|---|---|---|---|---|
| Conner Lab Corridor Structural Improvement (Project 1116) | FL Dept. of Agriculture and Consumer Services | VBS ITB-16927 | Tallahassee, Leon | Repairs and structural improvements to a laboratory corridor | Oct 21, 5:00 PM | Official posting |
| Settles Gym Floor and Bleacher Replacements | Florida School for the Deaf and the Blind | RFP-27-053 (VBS 17023) | St. Augustine, St. Johns | Replace the gymnasium floor and bleachers. The notice also lists an Oct 30 pre-bid response deadline. | Nov 4, 4:00 PM | Official posting |
| Transformer Replacement (Phase II) | Florida School for the Deaf and the Blind | ITB-27-049 (VBS 17146) | St. Augustine, St. Johns | Campus transformer replacement, phase II | Nov 5, 1:45 PM | Official posting |
| Conner Complex New Laboratory Facility, CMAR (Project 1175) | FL Dept. of Agriculture and Consumer Services | SOQ DOA 26 27 63 (VBS 17115) | Tallahassee, Leon | Construction manager at risk for a new laboratory facility | Nov 9, 5:00 PM | Official posting |
| Settles Gym Window Replacements | Florida School for the Deaf and the Blind | RFP-27-052 (VBS RFP-17113) | St. Augustine, St. Johns | Window replacement at the gymnasium | Nov 16, 1:45 PM | Official posting |
Coming soon
- Miami Beach Bandshell Renovation & Addition (City of Miami Beach): renovation plus an approximately 2,000 SF addition with offices, green room, dressing rooms, restrooms, loading dock and ticket booth. The city’s project page expects the ITB in December 2026 or early 2027. Project page
How this list is compiled
We review public solicitations from Florida state agencies (the Vendor Bid System on MyFloridaMarketPlace), cities, counties, school districts and special districts, and list building and vertical construction projects that are open at the time of the update. We only list solicitations we could confirm on the agency’s official posting, and we link to that posting. We don’t copy plans or documents from paid plan rooms.
Some portals require a free vendor registration to download documents. Many public bids require prequalification, a state contractor license, bid bonds or attendance at a mandatory pre-bid meeting. Read the solicitation carefully. Our guide to public bid estimating in Florida covers bonds, advertising periods and bid forms.
Get next month’s list
We refresh this page regularly. To get updates by email, email us with “Add me to the Florida bid list”.
Need a takeoff for one of these bids?
We price base bids, alternates and unit prices from the bid documents, and update quantities as addenda come out. Upload the plans and the solicitation number for a flat-fee quote, usually the same business day.
Related: Public bid estimating · Commercial construction estimating · Florida Building Code 2026 cost impacts · Florida construction cost per square foot · Trade estimating
Archive
- October 18, 2026: removed three closed bids (Phase 3 Lincoln Road, Miami Beach Convention Center restrooms, Camp Blanding training range CM).
- October 13, 2026: mid-month update. Removed the closed Jupiter Community Park bid, updated the Charlotte Harbor link to its addendum, added 9 new solicitations.
- October 10, 2026: first edition.